RISK MITIGATION STRATEGIES AND PERFORMANCE OF LARGE INFRASTRUCTURE PROJECTS: A CASE OF THE GRAND ETHIOPIAN RENAISSANCE DAM
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
THE CATHOLIC UNIVERSITY OF EASTERN AFRICA
DOI
Abstract
Large infrastructure projects in developing nations face multifaceted risks that significantly influence their performance outcomes. The Grand Ethiopian Renaissance Dam (GERD), as Africa's largest hydropower project, presents a critical case for examining the relationship between risk mitigation strategies and project performance in complex, large-scale infrastructure development. This study investigated the influence of financial, technical, political, and environmental risk mitigation strategies on the performance of the GERD project. The study employed a mixed-methods research strategy with a descriptive-correlational research design. The target population comprised 320 project managers, engineers, and senior officials directly involved in the GERD project, from which a sample of 178 respondents was selected using stratified random sampling and purposive sampling techniques. Data collection utilized structured questionnaires (with 167 valid responses, an 85.2% valid response rate from the 196 distributed) and key informant interviews with 15 senior officials, complemented by document review. Quantitative data were analyzed using descriptive statistics (frequencies, percentages, means, standard deviations) and inferential statistics (Pearson's correlation and multiple regression analysis) through SPSS version 26. Qualitative data underwent thematic analysis following Braun and Clarke's (2021) six-phase framework. The study was grounded in Prospect Theory, Contingency Theory, and Stakeholder Theory. Findings revealed significant positive relationships between all four risk mitigation strategies and project performance: financial (r=0.624, p<0.01), technical (r=0.657, p<0.01), political (r=0.583, p<0.01), and environmental (r=0.611, p<0.01). Multiple regression analysis showed that the four strategies jointly explained 67.4% of variance in project performance (R²=0.674, F=84.23, p<0.001), with technical risk mitigation making the strongest unique contribution (β=0.342, p<0.001). The study concludes that effective risk mitigation in large infrastructure projects requires comprehensive, integrated strategies addressing multiple risk dimensions simultaneously, with particular attention to technical capacity building and stakeholder engagement. Recommendations include strengthening integrated risk management systems, enhancing stakeholder consultation mechanisms, and investing in local technical capacity development for future large infrastructure projects in developing countries.
Description
THESIS